KZTO 836,00 (-0,59%)
Shares of KazTransOil JSC (KASE) 836,00 (-0,59%)
Brent ()
WTI ()
0
0
0

General Director of KazTransOil JSC got acquainted with flood control work at production facilities

 15.04.2024    113
As part of a working trip to the Atyrau Oil Pipeline Department, General Director (Chairman of the Board) of KazTransOil JSC Talgat Kurmanbaev got acquainted with the progress of work on the construction of a protective embankment with a length of about 700 meters around the T. Kasymov oil pumping station. 24 employees of KazTransOil JSC and 17 units of special equipment were involved in the construction of the embankment.

In addition, Talgat Kurmanbaev visited N. Shmanov oil pumping station, where the diking of the site from the side of the tank farm with a total length of 500 meters is being carried out. The embankment is being erected by 25 employees of KazTransOil JSC and 1 unit of special equipment.

The General Director (Chairman of the Board) of KazTransOil JSC noted that the purpose of the construction of protective barriers is to ensure the continuity of the oil transportation process and instructed to constantly monitor the flood situation to prevent threats of flooding of production facilities of KazTransOil JSC.
 
Categories: Press releases
Reaction:
Partners